The circulation in the Douro Line between Tua and Pocinho was restored after being interrupted by 18:00 today due to a
© Global Images
11/11/2026
by
Lusa
A circulation in the Douro Line between Tua and Pocinho was restored, after the cut by 18:00 today due to a “occurrence on the track”, it advanced the CP – Comboios de Portugal.
In an update at 19:40, CP indicated that the rail service on the Douro Line had been resumed.
The service had been interrupted between the stations of Tua (Carrazeda de Ansiães, Bragança district) and Pocinho (Vila Nova de Foz Côa, Guarda district) since 18:00.
As an official source of the CP, source of the Infrastructure of Portugal (IP) had also advanced to Lusa, by 18:20, the same information, that the circulation was stopped due to “occurrence on the track”, and it was not possible to confirm what the occurrence in concrete.

